The Iredell County Board of Commissioners met in Briefing Session on
Tuesday, April 6, 2004, 5:00 p.m., in the Iredell County Government Center (South
Wing Conference Room), 200 South Center Street, Statesville, NC.
Present were:
Chairman Steve D. Johnson
Vice Chairman Godfrey Williams
Doug Madison
Marvin Norman
Sara Haire Tice
Staff present: County Manager Joel Mashburn, Finance Director Susan
Blumenstein, Transportation Director Ben Garrison, Planning Supervisor Ron Smith,
Elections Supervisor Becky Galliher, Chief Deputy Rick Dowdle, Health Director Ray
Rabe, Nursing Director Donna Campbell, Communications Director David Martin,
Emergency Management Director Tracy Jackson, Support Services Director Jim
Vernon, and Clerk to the Board Jean Moore.
CALL TO ORDER by Chairman Johnson.
REQUEST FOR THE TEMPORARY CLOSING OF SR 1363 -
BETHLEHEM ROAD: Statesville Mayor John Marshall requested the county's
assistance in the temporary closing of a portion of Bethlehem Road. He said the
duration of the closing would be approximately six months.
Chairman Johnson said the Federal Aviation Administration (FAA) had
concerns that the road's traffic might interfere with the airport's instrument landing
system. He said an individual from Ohio University would conduct tests regarding the
situation.
Planning Supervisor Smith said he would detennine if the portion of the road
slated for closure was located in the county or city's jurisdiction.
In regards to the city/county Inter -Governmental Agreement pertaining to sewer
and the release of extra -territorial jurisdiction in the airport vicinity, Mayor Marshall
requested for these two items to be deleted from the 7:00 p.m. agenda.
REQUEST FOR APPROVAL OF A BUDGET AMENDMENT
REGARDING A $103,133 BIOTERRORISM GRANT: Health Director Rabe
requested permission to use a $103,133 grant for (1) office equipment (desk/file
cabinet) for the new part-time bioterrorism coordinator (2) vaccine freezer along with
an alarm system (3) planning and training equipment plus a contract with Larry
Dickerson for updates to the Bioterrorism Plan, and (4) a generator for the Statesville
main office. Rabe said the proposed generator costing $89,998.00 would,
unfortunately, only service about 10% of the building. He said that to have backup
service for the entire building, he would suggest buying one generator this year, and
another in 2005, if the same grant funds were available.
REQUEST FOR APPROVAL OF A BUDGET AMENDMENT
REGARDING A FAMILY PLANNING (TITLE X) GRANT: Health Director
Rabe said an additional $10,475 had been received for the Family Planning Program.
He asked permission to allocate the revenue for the following:
3 Clinic Exam Lights at $561 each $ 1,683
7 Wali Mounted Otoscope/Othalmoseopes
at $570 each 3,990
1 OBGYN Exam Table 885
1 Medical Records Cart 800
2 Acrylic Pamphlet Holders at $50 each 300
Contraceptive Technology Book 60
Foam and Condoms 2,757
(Note: The family planning grant was added to the agenda.)
REQUEST FOR GUIDANCE REGARDING THE 800 MHZ PROJECT:
Joining the commissioners for this portion of the meeting were Emergency
Management Coordinator Tracy Jackson and Communications Director David Martin.
Mr. Martin referenced a five-page report that outlined the Communications Task
Force's work since November 2002. He said the 800 MHz system had been designated
as a long-term goal in the report, and the task force now needed guidance on whether or
not the project should be pursued. Mr. Martin's written report is as follows:
Short Term (M Progress or Completed)
• Addition ofa communications tower in the northern portion ofthe county. An agreement was
signed with Olin Community Development and the Harmony VFD for the placement ofa 190 -
foot tower at 645 Olin Loop Road. The tower was bid and awarded at a cost of $43,303. The
tower is scheduled to ship sometime in April and should be erected by May.
• Facility Services has completed an addition to the building at Olin that will be used as an
equipment room for transmitters and other radio equipment.
• An emergency generator has been installed at Olin at a cost of $9,500.00, and it is in operation.
• Nine new Motorola Quantar transmitters have been purchased on state contract at a total cost
of $100,815 and are scheduled for delivery, in March. This will allow new transmitters for
Sheriff,' EMS/Rescue and County fire at three locations (Rhinehart, ECOM and Olin).
• New, antennas and coax has been purchased and installed at ECOM at a total cost of $7,456.
• New antennas have been hid and ordered for the Olin tower at a cost of $6,8 78 (installation not
included).
• FCC Licensing for the new Olin location and addition of Sherif7transmit site at ECOM have
been obtained.
• FCC Licensing ofa repeater input frequency for EMS/Rescue has been .submitted and passed
coordination. (Awaiting FCC license issuance.)
• Placement of receivers for Sheriff,' EMS/Rescue and County VFD at the West Iredell VFD
substation on Sharon School Road. (West Iredell VFD has agreed.) In process of locating a 40-
60faot section ofsmall tower to be placed. Receivers, currently, in operation at Union Grove
will be relocated to Sharon School Road upon completion ofOlin site.
Short Term (Not in progress)
Note. A Request for Proposal was issued in November 2002 for a complete simulcast system for the
Sheriff, EMS/Rescue and Countv Fire utilizing the sites at Olin, ECOM and Rhinehart During the prebid
conference there were a lot of unanswered questions regarding the analog versus digital microwave
system. A digital microwave system was not included in the budget, therefore the RFPs were cancelled.
• Upon receipt ofa repeater input license from the FCCfor EMS/Rescue, it is anticipated that
duphxers will be added and field units reprogrammed giving the capability of repeater function
to all EMS/Rescue units.
• It is recommended that a consultant be obtained to assist with the design and procurement of a
digital microwave system and simulcast capabilities on Sher{ff. EMS/Rescue and County Fire.
Current analog microwave links will have to be updated to digital and a new digital link
established for Olin in order to successfully complete a simulcast system. Currently obtaining a
proposal from RCC Consultants for their fees.
• It is recommended that the above simulcast system be implemented. It is anticipated the total
cost will be $250,000 - $270,000 including digital microwave and simulcast capability. The
current budget has approximately 5790, 000 remaining and $75, 000 has been included in the
04105 budget. (This is only an estimate. True IIures can not be obtained until completion of the
consultant's recommendations.)
2
• Renovation of the Rhinehart tower (painting, etc.) is needed to meet FAA/FCC compliance. This
is anticipated at a cost of $20, 000 and is included in the 04105 budget.
Long Term
The Communications Task Force, in researching the capabilities and desires of a long term radio system,
had several discussions with various vendors and looked at future possibilities. The following is a result
of those discussions.
• In March 2003, it was decided that 800 MHz technology, was a possibility that needed further
consideration. Due to issues such as interoperability, private talk groups, emergencv call
functions, spectrum refarming, as well as data transmission, makes 800 MHz the ultimate
system.
• The county, with the assistance of Mr. At Linker with Wireless Communications, appliedforsix
800 MHz frequencies (funded through the Sheriff's Department). The Town of Mooresville also
applied for six 800 MHz frequencies. It was the plan that these frequencies be combined for a
total county -wide system of twelvefrequencies. The FCC issued the frequencies in August 2003
which included afive year -slow -growth plan.
• In thefall of2003, the taskforce recommended that Mr. Al Linker be obtained as a consultant to
pursue recommendations, for a county, wide bunked radio system. The total cost far Mr. Linker's
services was $31,640 with the county share being 74% (823,414) based on population.
• Mr. Linker has recommended an 800 MHz .system with (full junctional) transmitters at
Rhinehart; Olin and ECOM (with a new 500 ft. tower built in West Statesville to replace the
tower at ECOM) and a mutual aid transmitter in the Love Valley area. There is a possibility
that a fourth site may be needed. This would allow for 95% in street portable coverage. The
hurastrucurre total cost for a fully functional three site system, new Statesville tower and one
mutual aid site was projected by Mr. Linker to be $4,680,000. Ifan additional fourth site is
needed the cost could increase by an estimated $1,300,000. The cost ofmobiles and portables
would range from $2,500 to $4,015 each. Replacement ofall radios now in service (1423 as of
,tall 2002) would cost between $3,557,500 and $5,713,345. On March 11, 2004, a tour was
conducted with a member of RCC Consultants. Upon examination of the Rhinehart tower, it was
his initial opinion that this tower would not be capable ofsupporting additional loading. It will
be imperative that the tower be capable ofsupporting additional equipment, including a six to
eight foot solid dish for digital microwave for an 800 MHz system. Therefore, replacement of
this tower would he needed to support 800 MHz at an estimated cost of $125, 000. Also, to
support a large enough digital microwave dish for 800 MHz, the tower at ECOM may need
upgrading to a larger tower at an estimated cost of $65, 000. Total implementation of an 800
MHz system is projected to cost $9,727,500 to $11,883,345. The county share ofthis cost, ifall
other jurisdictions participate, will be $7,198,350 to $8,793,676. (Based on a maximum four site
.system)
The Communications Task Force has recommended that a consulting firm be obtained to examine
this project. It is felt that a larger firm with experience in the implementation ofthese types of
systems is desirable over an individual consultant. It is projected that the total cost for such a firm
would be $220,481 to $270, 000 or about 2-2.5 percent of the total projected .system cost.
Comparisons
After consultation with other counties, it was learned that Forsyth County was in the process of
irnplementing an 800 MHz that will require eight tower sites. Catawba County has just concluded a
study that will require eleven tower sites (note that Catawba is requesting in house coverage instead
of in street coverage). Catawba County is looking at budgeting $400, 000 a year far seven years for
seven receiver sites and four transmit sites on VHF/UHF and upgrading current towers. This cost
does not include digital microwave that will be needed for simulcast. After bringing their current
system up to date, they advised they are projecting an additional $21 million to build out an 800
MHz system. At this point, they are not sure of their fume direction regarding 800 MHz.
With this information, it is questioned if the proposed three to jour- size system would he sufficient to
cover Iredell County. Any additional sites that may be required is projected to cost $1.3 - $1.5
million each.
Possibilities
The county could possibly work with the State Highway Patrol and the VIPER network to partner
with us and therefore maintain our current assigned 800 MHz frequencies, jf pursuit of our own 800
MHz system is not currently feasihle, but is planned for the future. There are variables associated
with this plan and retention of our 800 MHz frequencies would not be guaranteed.
Looking of alternative solutions for supplementing our current system is also possible. This could
include working with cell carriers to provide private talk groups and console integration until such
time as buildout of our own system is possible. Again, retention of our 800 MHz frequencies would
he questionable.
Options
Plan A
• Continue the upgrading of our current UHF/VHF system to a fully functional simulcast
system.
• Continuepursuit of afullv,funetional 800 MHz system and begin implementation diming
fiscal year 200412005 with full county -wide implementation completed in fiscal year
2007/2008.
Plan B
• Continue the upgrading of our current UHF/VHI'system to a fully functional simulcast
system.
• Continue pursuit of a fully functional 800 MHz system in stages with the first stage being
the placement of single sites at ECOM and Rhinehart. * This plan would benefit the City of
Statesville and the Town of Mooresville. There would not be county -wide coverage far
county units.
• County, to look at alternate supplemental private system until such time as county wide 800
MHz is implemented.
Plan C
• Continue the upgrading of our current UHF/VHF system to a fully functional simulcast
system.
• Totally, abandon the pursuit q1'800 MHz and begin exploring the possibility, of UIIF/VHF
trunking (no cost estimates available).
Conclusion
It is recommended that the county, continue to upgrade the current UHF/VHF.systems to include
digital microwave and simulcast. Retention of a consulting firm is needed to assist with design and
procurement.
An 800 MHz system is the "hest of the best, " if constructed to perform and cover the entire county.
However, it will be costly, to build a system to cover all the needs, and at this time, the total sites
needed is questionable. A consulting firm will be imperative to insure the design will cover all our
needs.
With FCC mandates, it will be imperative that future plans include 12.5 kHz radios by 2008 with
implementation ofsome type digital system by 2013.
Martin asked for direction regarding the 800 MHz project. He said the purchase
of the digital microwave system and the simulcast capabilities were highly
recommended, and the estimated cost was approximately $250,000.
Chairman Johnson asked Martin how satisfied he would be with the county's
coverage after the microwave and simulcast components were added.
Martin said the audibility with the three transitor sites simulcasting should be
fairly clear.
Chairman Johnson said the original estimates for the 800 MHz system were too
low, and he suggested that the county complete the projects already started. Johnson
said the 800 MHz costs might be lowered in the future, especially if the technology
changed.
Martin acknowledged that the prices for an 800 system seemed to continually
"grow."
Jackson said his department would stay alert as to price changes. He mentioned
that a discussion pertaining to directional amplifiers might be requested in the future.
Commissioner Williams asked if the task force would continue to meet.
4
Martin said yes.
Jackson asked if the board would like the staff to maintain the frequencies and to
continue working with the state.
Johnson said yes, and the options needed to be left open.