The Iredell County Board of Commissioners met with the Iredell-Statesville
Board of Education on Tuesday, February 15, 2005, at 5:00 p.m., in the Iredell County
Government Center (South Wing Conference Room), 200 South Center Street,
Statesville, NC.
Iredell County Commissioners Present were:
Chairman Sara Haire Tice
Vice Chairman Godfrey Williams
Steve D. Johnson
Marvin Norman
Ken Robertson
County Staff present: County Manager Joel Mashburn, Finance Director Susan
Blumenstein, Support Services Director Jim Vernon, and Clerk to the Board Jean
Moore.
Board of Education Members Present were:
Dr. David Cash, Chairman
Tara Cashion, Vice Chairman
Jim Head
Charles Kelly
David Parker
Keith Williams
School Staff present: Superintendent Dr. Terry Holliday, Deputy Supt. Dr.
Steve Lane, Dr. Kenny Miller, and Construction Manager Rob Jackson.
Chairman Tice called the board of commissioners to order, and Chairman Cash
called the school board to order.
Presentation of the Phase One Facility Study: Ed Watson, the Vice President
of the Construction Control Corporation, provided an overview of the Phase One study,
and a copy of his executive summary is as follows:
IREDELL-STA TES VILLE SCHOOLS/ IREDELL COUNTY
FACILITY SURVEY PHASE ONE
EXECUTIVE SUMMARY
(Revised)
Construction Control Corporation has completed Phase One of the Facility Study as
authorized by Iredell-Statesville Schools and Iredell County.
The study included inspections at each of the twelve facilities included in Phase One,
discussions with school and maintenance personnel, reviews of maintenance
information, a review of the ISS Classroom Analysis for Proposed Facility Plan, and
the Joint Task Force Long Range Facility Plan. These plans utilized the North
Carolina Public Schools Facilities Guidelines to determine new construction space
requirements. The personnel from Construction Control Corporation included one
person specializing in architectural/structural/civil areas and one person specializing
in the plumbing, HVAC, and electrical areas. The years of experience of these men
exceed 55 years in total.
Our review included evaluations of the following: Life Safety issues, ADA issues,
overall building condition from a physical standpoint (structural, roofing, plumbing,
mechanical, electrical, finishes, and building envelope), and site issues. Our review
identifies all work that we believe necessary to bring a building up to a level which we
would consider very good to excellent condition. This level is maintained at each
school so that all schools are as equal as possible. (An example of this would be
lighting levels in classrooms.) Some portions of the work we recommend may already
be on a schedule or within a budget to be done. We have found it best to identify all
work we see is needed in our report. Any items which are already planned can be
easily deducted from the cost we included.
We also identify code issues which may be interpreted differently by others and
therefore not enforced. If we believe an issue could result in an expense, we include
that issue in our projected costs.
The project costs included in the report that are used are all inclusive. All design fees,
construction, testing, surveying, furniture, equipment, demolition, land, transitional
space, and reasonably anticipated permits are included. The project costs have been
escalated on projects that are anticipated to bid after December 2005.
In 2004, construction costs increased at a much higher rate than the historical average.
The global construction market and higher petroleum costs were the prime causes. The
market remains unsettled to the point that we cannot predict with confidence how the
construction costs will change during the duration of this program.
The cost of Phase One is projected to be $116,893,129. The cost per school in Phase
One is included as Page 3. A detailed breakdown of cost for each school is included in
the final report dated February 15, 2005. This cost may be broken down into:
New Construction
$
80,881,290
Renovations
$
9,166,731
Transitional Classrooms Renovations
$
1,610,000
Program Contingency
$
4,960,737
Non -Construction Costs
$
11,380,338
Land
$
4,700,000
Escalation
$
4,194, 033
TOTAL
$116,893,129
One of the tasks we have during a,facility study is to determine at what point do we
recommend that a school be replaced rather than renovated and/or expanded. The
most widely used method of this determination is the 70% Rule. The 70% Rule
establishes that if the cost of renovations and additions exceeds 70% of the cost of a
new school of the same size, it is more prudent to replace the school. For that reason,
we recommend replacing Statesville High School, N.B. Mills Elementary School, and
Mount Mourne Elementary School and utilizing the existing schools in alternative ways.
N.B. MILLS ELEMENTARY SCHOOL $ 11,794,781
Combine with Monticello
New Elementary School
Renovation/Additions costs exceeded the 70% rule.
MOUNT MOURNE ELEMENTARY SCHOOL $ 11,794,781
New Elementary School
Renovation/Additions costs exceeded the 70% rule.
SHARON ELEMENTARY SCHOOL $ 5,830,601
General renovations and additions
TR 0 UTMA N EL EMENTA R Y SCHO OL $ 9,056,225
General renovations and additions
2
BRA WLEY MIDDLE SCHOOL $ 4,690,140
General renovations and additions
NORTH IREDELLMIDDLE SCHOOL $ 4,385,389
General renovations and additions
STATESVILLE MIDDLE SCHOOL $ 1,295,866
General renovations
TROUTMANMIDDLE SCHOOL $ 4,876,939
General renovations and additions
WEST IREDELL MIDDLE SCHOOL $ 5,004,145
General renovations and additions
LAKE NORMAN HIGH SCHOOL $ 4,856,088
Additions only
STATESVILLE HIGH SCHOOL $ 39,959,850
New High School
Renovation/Additions costs for Phase I and Phase 2
are projected to exceed the 70% rule.
WEST IREDELL HIGH SCHOOL $ 13,348,324
General renovations and additions
TOTAL PHASE ONE $116,893,129
Commissioner Robertson asked about any options in regards to ADA
requirements.
Watson said requirements in the past had varied, and this was why the study
used ADA worst-case scenarios, or estimates, for the schools. He said the local
officials (fire marshal and code enforcement workers) made the ADA determinations.
Vernon added that ADA requirements were lawsuit driven. He said the North
Carolina Accessibility Code was used in Iredell County, along with the "50% Rule."
Iredell-Statesville Schools Construction Manager Rob Jackson then presented
the following construction totals that were recommended by the system's administrative
division:
Summary of Construction Totals as Recommended by ISS Administration
Brawley Middle
$3,433,642.35
Lake Norman High
$4,858,656.48
Mt. Mourne Elementary
$11,148,879.34
NB Mills/Monticello Elementary
$8,440,452.20
North Middle
$3,420,769.92
Sharon Elementary
$5,105,667.28
Statesville High
$16,544,865.25
Troutman Elementary
$8,578,269.65
Troutman Middle
$2,929,930.69
West High
$12,274,578.09
West Middle
$3,419,213.44
TOTAL
$80,154,924.69
Chairman Tice asked how many Iredell-Statesville schools were sprinkled.
Jackson said the five schools most recently constructed or renovated (Third
Creek, Lakeshore, Woodland Heights, Scotts, and Harmony) had sprinkler systems.
3
Watson said $3 a foot was the usual estimate for sprinkler systems.
Dr. Miller said the system had 145-149 trailers (varied on a day-to-day basis),
but it was hoped the number could be reduced to 38 in the future. He said that for the
2005-06 school term, 21 additional trailers were needed.
Commissioner Robertson asked about the recommended replacement for Mount
Mourne, especially since construction had occurred at the school in recent years.
Miller said the school basically sat on a rock quarry, and it was a "restricted
site."
Dr. Holliday said the school system's recommendation on Mount Mourne was to
continue it as an educational facility, but to reduce its population.
Robertson asked if the school system's $80 million estimate included
maintenance costs.
Jackson said no.
Robertson asked if there were any costs that would occur, if nothing resulted out
of the study or Phase I.
Dr. Holliday said one example would be increased costs at Lake Norman High.
He said if nothing occurred, the school might have to use an extended -day schedule.
Holliday said 98% of the county's growth had occurred in the southern end. He said
schools in the other areas of the county primarily needed equity, along with the
elimination of modular units.
Jackson said newer schools were also more utility efficient. He said the utility
costs for ADR and Wayside were $1.61 per sq. ft, prior to their closing, compared to
Third Creek Elementary's cost of 94¢ for the same square footage.
Parker asked Finance Director Blumenstein about the bond costs.
Blumenstein said it depended on what was issued at one time. She said the
RFPs were ready.
Dr. Cash said the finance subcommittee could continue to meet to discuss the
financing options.
Dr. Holliday mentioned the Phase I timeline and said the system needed to know
when the bid process could begin. He said the school system was already funding the
architectural work.
Blumenstein said "firm numbers" were not available from the county's tax
assessor or the state (sales taxes). In regards to Certificates of Participation, she said
the majority of bids had to be ready before the bonds were sold. She mentioned some
estimates would be given at the Winter Planning Session (Feb. 25-26, 2005), but better
numbers would be available around April 15.
Dr. Holliday asked Tice and Cash to contact House Representative Ray and
request that a blank place holder legislative bill be drafted before the deadline.
Chairman Tice said she would talk to Mrs. Ray.
Commissioner Johnson said the two boards could meet at the Winter Planning
Session and discuss "minimum" numbers. He said more firm monetary figures would
be available around April 15.
4
ADJOURNMENT: At approximately 5:55 p.m., Chairman Tice made a
otion to adjourn the joint meeting for the board of commissioners
VOTING: Ayes — 5; Nays — 0.
Chairman Cash, then, adjourned the meeting for the board of education.